For Part 4 - I chose a 3-color Gradient of Blue, Black, and Yellow.
Friday, October 3, 2025
Long Draw Spinning Practice - 2025, part 4
Friday, September 26, 2025
Fiber Arts Friday: Cozy Stripes Sweater, part 11
Whence last we left this project it was June 2025 and there was one and a half arms, buttons, and weaving in ends to go.
It's been a hot summer.... so I haven't made much progress on my Rainbow Vanilla Socks either, but I have been spinning (TdF, Long Draw). :-)
We are finally getting more regular, cooler, weather, which means I finally picked up The Cozy Stripes Sweater on September 14th!
In the last week or so, I was able to mostly complete the large brown block on Sleeve #1. The goal is 108 rows, but I ran out of Skein #8 at 104 rows.
So I plan to leave it as is until Sleeve #2 reaches the same place. Then I will try the sweater on and reassess when to begin the stripes for the end of the sleeves.
I have two Brown Skeins remaining plus ~14g of Skein #7.
I am happy to be working on this project again.
Skein duration:
- #1 (11/2/24 - 12/10/24) 5wks 3days
- #2 (12/10/24 - 12/30/24) 2wks 6days
- #3 (12/30/24 - 1/6/25) 1 week
- #4 (1/6/25 - 1/18/25) 1wk 5days
- #5 (1/18/25 - 2/5/25) - 2wks 4days - 14 g remain
- Green (2/5/25 - 2/6/25) - 2days - 22 g remain (begin body stripes)
- Orange (2/6/25 - 2/8/25) - 3days - 23g remain
- #5 (2/8/25 - 2/9/25) - 2days - 11 g remain
- Orange (2/9/25) - 1day - 18 g remain
- Green (2/10/25 - 2/14/25) - 5days - 17 g remain (complete body stripes)
- #5 (2/14/25 - 2/20/25) - 6days (begin hem)
- #6 (2/20/25 - 2/25/25) - 5days - 20g remain (complete hem, bind off pending)
- TINK Body Hem (2/27/25 - 3/6/25) - 8days
- #5 (3/6/25 - 3/22/25) - 2 wks 2 days (begin re-Knitting Body Hem with smaller needles, US3)
- #6 (3/22/25 - 3/23/25) - 2 days (complete and bind-off Body Hem) - 19g remain
- Pickup Collar/Button Band Stitches (3/24/25 - 3/30/25) - 6days
- #6 (3/30/25 - 4/10/25) - 11days (begin Button Band/Collar, US3)
- #7 (4/10/25 - 4/22/25) - 12days (complete Button Band/Collar and Bind off) - 14g remain
- #8 (4/23/25 - 6/4/25) - 6wks (begin Sleeve #1, on hold for the summer) - 10g remain
- #8 (9/14/25 - 9/22/25) - 8 days (restart Sleeve #1, large brown section nearly complete)
Friday, September 19, 2025
Long Draw Spinning Practice - 2025, part 3
For Part 3 - I chose a 2-color gradient of Black and Yellow, made from unknown wool.
Friday, September 12, 2025
Fiber Arts Friday: Rainbow Vanilla Socks, part 3
In episode 3, I have been working on the feet of these Rainbow Vanilla Socks.
Simple Socks are the best for waiting around knitting.
- They are small, therefore portable.
- They can be stopped at any time.
- It's easy to pick up at any time and know where you are in the pattern.
So far, I have worked on these while waiting for:
- warranty work on my truck,
- while travelling to an Invitational Dog Show
- while waiting for events at said Invitational Dog Show
- at the DMV
- Waiting for a yoga class to start
As of today, finally in mid-September 2025, I have completed foot #2.
Happy Fiber Arts Friday!
Friday, September 5, 2025
Long Draw Spinning Practice - 2025, part 2
For Part 2 - I chose BFL again. This is a blue and green colorway where the colors were placed on the Blending Board in 1/4 sections.
Friday, August 29, 2025
Long Draw Spinning Practice - 2025, part 1
One thing to note about this project, is that I am giving myself permission to be bad at something... AND putting it in a public space. YIKES. Not that many people are still reading this blog, but it will be discoverable by anyone. Double YIKES.
Learning is about improving skills... or at least going from a place of relative incompetence to a place of better competence in a target topic area.So in this case, I am objectively a good spinner in Worsted techniques and I am reasonably competent now at preparing fiber for Worsted spinning... but I have spent very little time working on Woolen, or even semi-Worsted techniques. So this project is intended to chronical this journey.
