Friday, August 28, 2020

Fiber Arts Friday: Tour de Fleece 2020, part 7

As a reader of this blog, you may be getting tired of so much spinning...
  • Since it's summer my feet are not getting cold while spinning.
  • I'm not travelling so I have more flexibility for spinning time.
  • I've had a hand/wrist injury that has made knitting painful for the last several weeks.
So there has been a lot of spinning over the last few months... and will be more with the Tour de Fleece 2020 v2.0 starting tomorrow.  :-)


While I was having a very productive Tour de Fleece v1.0 earlier this year, I carded bunch of Tibetan Mastiff.  This time it's from Ramen.  I had been chatting with some of the other chiengora spinners and thought I might produce a skein for the Best Bred by Exhibitor for our National Specialty.  Which was cancelled, rescheduled, and cancelled again this year due to COVID-19. 


The next likely opportunity for our National Specialty is March/April 2021, so I have time to get a skein finished... and of course, decide for sure if it will be gifted.  ;-)




I have 2 goals for this Tour de Fleece:
  • Complete the Prepared Ramen - 7 ounces have been separated into 3 groups of batts.  In order to complete the singles during this tour I need to spin one batt per day or one group per week.
  • Move my SE2SE Project Forward - I have 3 breeds in queue but am not committed to achieving as much as round one.
    • Hog Island was started in early August.
    • Dorset Horn is ready to go.
    • Santa Cruz is waiting to be carded.
  • Considerations for the Challenge Days are Milk and Pearl rovings.
  • I don't have a daily time goal, though I am planning to keep track of time spent.
I joined the Chiengora Team again since Tibetan Mastiff will be my primary focus for this Tour.

Tour de Fleece Dates:

     Begins:  Saturday, August 29
     Challenge:  Sunday, September 6
     Rest:  Monday, September 7
     Rest:  Monday, September 14
     Challenge:  Thursday, September 17
     Ends:  Sunday, September 20

Round 2 Starts tomorrow!  Happy Fiber Arts Friday!!

Friday, August 21, 2020

Fiber Arts Friday: Shave 'Em to Save 'Em, Leicester Longwool

Breed - Leicester Longwool


This was my first breed for the 2020 Tour de Fleece and my 11th SE2SE breed.

The staple is about 5 1/2 inches in a nicely prepared roving.





Thanks to the Tour de Fleece, not travelling, and being laid off due to COVID-19, I was able to spend more time than normal spinning, and therefore made some great progress on my Shave 'Em to Save 'Em project.


Before a bath...


The Leicester skein ties came loose during washing.... it's surprising how slippery this longwool is.  I retied the skein using feedbag twine.  I need to remember so I either change it or don't enter this skein into any competitions.


The Livestock Concervancy states that the Leicester Longwool was developed in the mid-1700's in England by Robert Bakewell and were in the Americas by the early 1800's.  The Leicester Longwool is listed as Threatened, meaning that fewer than 1000 sheep are registered in the US each year and that the estimated global population is less than 5000.

I greatly enjoyed spinning this breed and love the luster of the Leicester.  :-)

This breed roving was sourced from The Ross Farm in Pennsylvania.

Final Yarn: Leicester Longwool
Single Duration: June 27 - June 30, 2020
Ply Duration: July 1 - July 2, 2020
ounces: 4.25
yards: 144, 2-ply
wpi:  14

Ready to Submit:  July 4, 2020

SE2SE Status:
Total Breeds: 22
Breeds Sourced: 16
Breeds Spun: 11
Breeds To Go: 11

Months Remaining: 16 (12/31/21)

Happy Fiber Arts Friday!

Friday, August 14, 2020

Fiber Arts Friday: Shave 'Em to Save 'Em, Shetland

Shetland - This batt is part of the Connecticut trilogy sourced from Tranquil Morning farm.


As mentioned earlier, I have a Shetland provider, but buying this, means that my whole fleeces can go directly into our products, rather than having to pinch 4 oz for my SE2SE quest.

I have been interested in Shetland Sheep for a long time.  I learned to spin on Shetland and they are on our short list, if we were ever to add sheep to the farm.  My friend, Deb Robson, is especially interested them, so I've had the opportunity to learn from her enthusiasm.

When I paused the Santa Cruz, next on my list was this Shetland which was provided in batts.... I decided that I'd prefer to have this in roving, so I spent some time with the fiber and spun the CVM out of order.


I spent a cold, rainy morning in June (6/9/20) breaking up the batts up and pulling them thru a couple of washers.  It's not a very refined roving, but should be easier to spin.


I weighed and separated the sections, so I could get to a relatively even 2-ply yarn... 51+53g.

This Shetland sample has a staple just short of 2-inches.


I started spinning this in mid-June, just prior to the Tour de Fleece starting, but completed both singles and the plied yarn in a few days.


This is the most irregular yarn I've made in a long time, but I think it would be fun in a hat.


There's still some VM in the final yarn, but I love the variation in color and the rusticness of this yarn.  I think it would be fun in a simple hat.


The Livestock Concervancy has the Shetland listed as Recovering, meaning that they have exceeded the Watch Category of 10,000 registrations, but are still in need of monitoring.

It feels good knowing that I am able to support a local conservation breeder of rare breed livestock.  :-)

Final Yarn: Shetland
Pull Batts into Roving:  June 9, 2020
Single Duration: June 17 - June 22, 2020
Ply Duration: June 22 - June 25, 2020
ounces: 3.5
yards: 18, 2-ply
wpi:  10

Ready to Submit:  June 27, 2020

SE2SE Status:
Total Breeds: 22
Breeds Sourced: 16
Breeds Spun: 10
Breeds To Go: 12

Months Remaining: 16 (12/31/21)


Happy Fiber Arts Friday!

Friday, August 7, 2020

Fiber Arts Friday: Shave "Em to Save 'Em, CVM - post 7/31

CVM - I found this CVM (California Variegated Mutant) at the Estes Park Wool Market last year, from Aniroonz Sheep Company based in Ft Collins, CO.  I love the soft grey color and soft handle.


I really enjoyed the shepherd and her shop help.  They had several of the SE2SE breeds, and I bought more Karakul, mostly because she loved them so much.  :-)

You don't know that I'm going out of order.... but, this was next on my list after the Santa Cruz was paused and the decision to process the Shetland further...


I forgot to weigh the roving prior to starting, so I split the sample in two based on an estimate, which turned out reasonably close for plying.


CVM is the colored version of Romeldale.  Both are American breeds.  The Romeldale is a result of dedicated breeding program involving Romney and Rambouillet.  The goal was a white wooled sheep.  But when Glen Eidman found a small flock of colored Romeldales, he decided to focus on developing this variation.  The name CVM (California Variegated Mutant) sounds like a scientist made it up, rather than an artist or marketing person named the breed.  lol.

I loved spinning this sample.  The preparation was well done and the fiber, itself, was just lovely.


I think this breed would be wonderful to use in garments where one might choose Merino or BFL.  It's delightfully, next-to-skin soft.

As always, it feels good knowing that I am able to support a local conservation breeder of rare breed livestock.  :-)

The Livestock Concervancy lists the CVM/Romeldale as Threatened, meaning that fewer than 1000 sheep are registered in the US each year and that the estimated global population is less than 5000.

Final Yarn: CVM
Single Duration: April 25 - June 11, 2020
Ply Duration: June 11 - June 16, 2020
ounces: 4.5

yards: 344, 2-ply
wpi:  16

Ready to Submit:  June 24, 2020

SE2SE Status:
Total Breeds: 22
Breeds Sourced: 16
Breeds Spun: 9
Breeds To Go: 16

Months Remaining: 17 (12/31/21)

Happy Fiber Arts Friday!

Friday, July 31, 2020

Fiber Arts Friday: Spinning Suri Alpaca, White

I started spinning this Suri Alpaca in March 2016.  It rested a lot, but then got a lot of attention as I tried to finish it before the Tour de Fleece in 2017.

It was not finished.


Then I worked on it some more, trying to finish it before the 2018 Tour de Fleece.

It was not finished.


There it waited on the bobbin storage rack for another window....


with only 3/4 of an ounce to go.


Finally, in June, as I was preparing for the 2020 Tour de Fleece and I was able to finish the last 3/4 oz.  :-)


668 yards, 24 wpi


Some yarns just take longer than others... kind of like some stories.  ;-)

Happy Fiber Arts Friday.

Friday, July 24, 2020

Fiber Arts Friday: Tour de Fleece 2020, part 6

Day 21 - Friday, July 17
Chiengora - Gold Tibetan Mastiff: 32 Minutes

I have some clockwise Gunnar singles that are unfinished.


I've been working on this drop spindle for a while (2019) and know that it does not have a continuous single.  So I wound each of them off by hand for a 
total of 22 grams or ~3/4 oz of prior-completed singles.



I will add these to the single I started spinning last Wednesday for a 3-ply yarn, hopefully to be completed on the last day of this Tour.



SE2SE - Shropshire: 39 Minutes


Podcasts/Timekeeping:

Wise Traditions by the Westin A Price Foundation - 1/2 episode

Total Time: 1 hour 11 minutes



Day 22 - Saturday, July 18
Chiengora - Gold Tibetan Mastiff: 36 Minutes


SE2SE - Shropshire: 92 Minutes


Podcasts/Timekeeping:

Wise Traditions by the Westin A Price Foundation - 1 3/4 episodes

Total Time: 2 hours 7 minutes


Day 23 - Sunday, July 19
Chiengora - Gold Tibetan Mastiff: 49 Minutes

Today is the last day of the Tour.  So I organized the Gold TM singles by weight and started plying them... heaviest (and theoretically longest) first.



The 5 small singles to the left and the large cake finished out at exactly the same time, so I have a tiny bit of the largest ball to the right remaining.... 48 yards of 3-ply.


SE2SE - Shropshire: 64 Minutes

I have a bit more of this single to complete, but I feel good about my progress on this yarn... 78 g spun, 36 g remain.


Podcasts/Timekeeping:

Wise Traditions by the Westin A Price Foundation - 2 1/2 episodes

Total Time: 1 hour 53 minutes

1 yarns completed and 5 hrs 11 minutes of spinning for the week

For a total of 8 yarns completed and 31 hrs 7 minutes of spinning for the Tour.


Epilogue
For me, spinning is very much a solitary activity.  I use the time to listen to music, the news, podcasts, or just quietly think.

What I love about the Tour de Fleece, is that it makes the solitary activity of spinning more of a community event.  There's a daily (or so) check in with the team who are there to cheer each other on, to offer advice, and inspiration.

As an introvert, this is the best part.... I have the benefits of extroverting without spending the energy of being in a crowd.  And often the members of the team are located all across the country and sometimes in other countries, which adds to the richness of the experience.

My goal for this Tour was to spend at least an hour each day, dividing that between my two wheels.  I definitely achieved that goal.  :-D  I learned that like having two yarns going at the same time because helps to keep from getting bored, even if it might be harder to follow in a daily tracking blog post.

This has been the most productive Tour for me in quite some time and I made great progress on my SE2SE project.  Which I'll post more about later.

The 8 completed yarns constitute 646.9 yards and 495 grams (17.46 oz).


SE2SE: across the top, L-R
  • Leicester Longwool:
    • 144 yd, 2-ply, 14 wpi, 119 g / 4 1/4 oz
  • Cotswold
    • 111 yd, 2-ply, 10 wpi, 106 g / 3 3/4 oz
  • Shropshire
    • 78 grams in a single
Chiengora: across the bottom, L-R
  • Mill-ends Roving, Tibetan Mastiff + Huacaya Alpaca + Shetland Wool:
    • 105 yards, 2-ply, 13 wpi, 65 grams (2 1/4 oz)... 42 grams spun during this TdF
  • Core Spun - Gold Tibetan Mastiff:
    • 71 yards, variable wpi, 61 grams
  • 50:50 Roving, Tibetan Mastiff + Huacaya Alpaca:
    • 156 yards, 12 wpi, 88 grams, 2-ply
  • Core Spun - Gold Tibetan Mastiff:
    • 3.9 yards, variable wpi, 8 grams
    • 8 yards, variable wpi, 16 grams, 2-ply
  • Gold Tibetan Mastiff Only:
    • 48 yards 12 wpi, 32 grams, 3-ply
Podcasts/Timekeeping:

While I did make progress on my Podcast backlog, I spent most of my spinning time listening to the news or music.
  • Wise Traditions by the Westin A Price Foundation - I began this Tour with a 2 year and 1 week backlog of episodes.   I ended this tour with a 1 year and 6.5 month backlog.  So I gained about 6 months on the backlog.
  • Professional Weaver -  I began this Tour with a 2 episode backlog, listened to 2 episodes, and finish with a 3 episode backlog.
The actual Tour de France is still planned to begin at the end of August.  So a second Tour de Fleece is  planned to follow the re-scheduled Tour de France, August 29-September 20.  I already have my fibers set aside for round two!

Happy Fiber Arts Friday!

Wednesday, July 22, 2020

Sourdough, part 2

After a week or so of daily feeding the reserved portion of my first starter, I had another 3 cups of prepared sourdough starter... 2 cups for a second loaf and reserving the remainder for the next batch of starter.

Last time I took the idea of "soft dough" as the outside texture.... I am a fiber artist.  So while the texture was smooth, soft, and therefore not sticky, the resulting bread was tough.

So this time, I spent less time kneading and was more mindful about the flour I added.... I do think this is a "softer" dough, in that it's a bit sticky, but not tough.

I also put it through two rounds of proofing.  The first in an oiled bowl overnight that was covered in both plastic wrap and a towel.  I think this helped to keep the dough from getting too dry.




The second in loaf form... also oiled and covered in plastic wrap and a towel.


I slashed the loaf after 2 hours,


and baked for about 45 minutes at 350F.


I tried to take extra care in the shaping step this time around, but I need more practice to ensure any remaining creases are on the underside of the loaf.


This definitely a better loaf.... in crumb, texture, and taste.  Even if it is a little flat.  The final bowl rise photo shows the dough loosing it's shape.  So I think it needs to knead longer, but probably not much more flour.  So round 3 should be even better, right?  :-)

Happy Baking!