In part 11, I had nearly completed the large brown block on Sleeve #1 (104 of the 108 row goal). Today, I am not quite in the same place on Sleeve #2... 97 of 108 row goal for the block.
The difference could be in gauge, where I started the skein, and/or deltas between winding of skeins at the mill.
After trying on the sweater, I have decided to continue with the plan as written with the 14g remaining on Skein #7.
I maybe should have made the body a little longer.... it is fine in the back, but the collar makes the front pull up a bit. I can fix some of that with blocking and folding the collar down. So we'll see how it is when everything is finished.
Skein duration:
- #1 (11/2/24 - 12/10/24) 5 wks 3 days
- #2 (12/10/24 - 12/30/24) 2 wks 6 days
- #3 (12/30/24 - 1/6/25) 1 wk
- #4 (1/6/25 - 1/18/25) 1 wk 5 days
- #5 (1/18/25 - 2/5/25) - 2 wks 4 days - 14 g remain
- Green (2/5/25 - 2/6/25) - 2 days - 22 g remain (begin body stripes)
- Orange (2/6/25 - 2/8/25) - 3 days - 23g remain
- #5 (2/8/25 - 2/9/25) - 2 days - 11 g remain
- Orange (2/9/25) - 1day - 18 g remain
- Green (2/10/25 - 2/14/25) - 5 days - 17 g remain (complete body stripes)
- #5 (2/14/25 - 2/20/25) - 6 days (begin hem)
- #6 (2/20/25 - 2/25/25) - 5 days - 20g remain (complete hem, bind off pending)
- TINK Body Hem (2/27/25 - 3/6/25) - 8 days
- #5 (3/6/25 - 3/22/25) - 2 wks 2 days (begin re-Knitting Body Hem with smaller needles, US3)
- #6 (3/22/25 - 3/23/25) - 2 days (complete and bind-off Body Hem) - 19g remain
- Pickup Collar/Button Band Stitches (3/24/25 - 3/30/25) - 6 days
- #6 (3/30/25 - 4/10/25) - 11 days (begin Button Band/Collar, US3)
- #7 (4/10/25 - 4/22/25) - 12 days (complete Button Band/Collar and Bind off) - 14g remain
- #8 (4/23/25 - 6/4/25) - 6 wks (begin Sleeve #1, on hold for the summer) - 10g remain
- #8 (9/14/25 - 9/22/25) - 8 days (restart Sleeve #1, large brown section nearly complete)
- #9 (9/23/25 - 10/13/25) - 3wks (begin Sleeve #2)
Happy Fiber Arts Friday!
No comments:
Post a Comment