Alpaca Loafing Sheds - 50% complete

Today, the alpaca loafing sheds are just over half way done. 

Our most recent snow has not melted very quickly which is making the pasture and corral area extremely muddy.  Our carpenter's truck got stuck in the mud, so we will have to re-seed some in the spring.


Boys' sheds framed out.


Our carpenter used hurricane ties as part of the contstruction. 
I think is a good idea since we can have 90 mile per hour gusts here sometimes.


Mom and cria shed with the roof installed.

All three sheds have the roof and tar paper installed and the shingles and sides should be complete in a couple of weeks.